Customization: | Available |
---|---|
Warranty: | 1 Year |
Color: | Yellow or Red |
Still deciding? Get samples of US$ 70/piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model |
Capacity (kg) |
Break load (kg) |
size(mm) |
N.W kg |
Dimension L*W*H(cm) |
|||
L |
B |
H |
R |
|||||
PML-100 |
100 |
250 |
90 |
63 |
68 |
145 |
3 |
25*16*16 |
PML-400 |
400 |
1000 |
160 |
95 |
180 |
160 |
11 |
32*20*17 |
PML-600 |
600 |
1500 |
220 |
115 |
125 |
230 |
20 |
37*23*21 |
PML-1000 |
1000 |
2500 |
260 |
145 |
145 |
280 |
35 |
43*28*24 |
PML-1500 |
1500 |
3750 |
310 |
145 |
145 |
280 |
48 |
44*23*24 |
PML-2000 |
2000 |
5000 |
340 |
160 |
165 |
410 |
65 |
52*30*31 |
PML-3000 |
3000 |
7500 |
420 |
185 |
185 |
510 |
90 |
60*30*31 |
PML-5000 |
5000 |
12500 |
580 |
300 |
300 |
650 |
190 |
73*40*48 |
Lifting magnet has strong magnetic path produced by NdFeB magnet. On and off magnetic path is controlled by turning the manual handle. The lifters have the features of strong attraction, smaller volume, lighter weight, powerful lifting effort, easy and safe to operate, long-period effort and without power supply. They are been used to lift and transport the steel and iron for factories, docks, ware houses, and so on.
Product Show:
Workroom of lifting magnet
Model | Length | Width | Height | Weight |
100KG | 24.5 | 15 | 15.5 | 3.1 |
400KG | 29 | 18.5 | 17.5 | 10 |
600KG | 34.5 | 20.5 | 22 | 22 |
1000KG | 40.5 | 23.5 | 26 | 35 |
1500KG | 44 | 23.5 | 26 | 41 |
2000KG | 48 | 26.5 | 27.5 | 66 |
3000KG | 58.5 | 27.5 | 29.5 | 86 |
5000KG | 68 | 40.5 | 36 | 195 |
10000KG | 380 |
1. Packing: Wooden case and Pallet
2. MOQ:1 piece
3. Payment: 30% TT in advance
4. Lead time: 1 week
5. Delivery time: 1 month
6. Load Port: Tianjin